My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-31_PERMIT FILE - C1981019A (13)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2020-03-31_PERMIT FILE - C1981019A (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2023 10:51:51 AM
Creation date
5/6/2020 5:12:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/31/2020
Doc Name
Prospect Sedimentation Pond
Type & Sequence
TR136
Section_Exhibit Name
Exhibit 07 Item 20 Part PP
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEDCAD 4 for Windows <br /> (`nnvnnht 1 QQR.. f 1 n Pamola I Crhwah <br /> 10 <br /> Material: Smooth brome <br /> Left Right Freeboard Freeboard Freeboard Limiting <br /> Bottom Retardance <br /> Sideslope Sideslope Slope(%) Mult.x Velocity <br /> Width (ft) Ratio Ratio Classes Depth(ft) %of Depth (VxD) (fps) <br /> 12.00 2.0:1 2.0:1 14.6 D, B 1.00 5.0 <br /> Vegetated Channel Results: <br /> Stability Stability Capacity Capacity <br /> Class D w/o Class D w/ Class B w/o Class B w/ <br /> Freeboard Freeboard Freeboard Freeboard <br /> Design Discharge: 0.00 cfs 0.00 cfs <br /> Depth: 0.00 ft 0.00 ft <br /> Top Width: 0.00 ft 0.00 ft <br /> Velocity: 0.00 fps 0.00 fps <br /> X-Section Area: 0.00 sq ft 0.00 sq ft <br /> Hydraulic Radius: 0.000 ft 0.000 ft <br /> Froude Number: 0.00 0.00 <br /> Roughness Coefficient: 0.0691 0.0000 <br /> Structure #31 (Pond) <br /> Pond PD1 <br /> Pond Inputs: <br /> Initial Pool Elev: 7,355.00 ft <br /> Initial Pool: 0.88 ac-ft <br /> Emergency Spillway <br /> Spillway Elev Crest Length Left Right Bottom <br /> (ft) Sideslope Sideslope Width(ft) <br /> 7,356.00 20.00 2.00:1 2.00:1 20.00 <br /> Pond Results: <br /> Peak Elevation: 7,356.10 ft <br /> Dewater Time: 0.53 days <br /> Dewatering time is calculated from peak stage to lowest spillway <br /> Elevation-Capacity-Discharge Table <br /> Filename:Prospect Pond 25 Yr 24 Hr Storm Event.sc4 Printed 01-06-2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.