Laserfiche WebLink
below the settleable solids requirement at 0.0 ml/l, and this modeled storm event does not <br /> engage the emergency spillway. <br /> An additional SEDCAD model has been run on this watershed to evaluate the runoff <br /> from the 25 year, 24 hour storm through Prospect Pond. This storm results in the <br /> maximum water level with Prospect Pond of 6752.77 feet, or 0.77 feet through the <br /> emergency spillway, leaving 2.23 feet of freeboard. <br /> Exh. 7-PP-2 Revision Date: 1/6/20 <br /> Revision No. TR-136 <br />