Laserfiche WebLink
<br /> <br />Cycle Time: <br /> <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br /> <br />Job Condition Correction: Site Altitude: 7500 feet <br /> <br /> Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiency: 0.830 NA (CAT HB) <br /> <br />Net Correction: 0.830 NA <br /> <br />Travel Time: <br /> Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br /> <br />Haul Route: <br />Travel Time <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity <br />(min) <br />(%) (%) (%) (fpm) <br />1 2650.00 2.00 2.00 4.00 2394 1.33 <br /> <br />Haul Time: minutes <br />1.33 <br /> <br />Return Route: <br />Travel Time <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity <br />(min) <br />(%) (%) (%) (fpm) <br />1 2650.00 -2.00 2.00 0.00 2965 1.00 <br /> <br />Return Time: minutes <br />1.00 <br /> <br />Total Scraper team cycle time: minutes <br />3.93 <br />Adjusted for job conditions: 734.96 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 734.96 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: LCY/Hour <br />2,939.85 <br /> <br />Unadjusted unit production/hour: 885.50 LCY/Hour <br />Optimal Number of Scrapers per push <br /> <br />dozer: <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 4 Team(s) Total job time: Hours <br />35.29 <br /> <br /> <br />Unit cost: $1.780 /LCY Total job cost: <br />$184,640 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />