My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-06_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2020-05-06_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 6:34:52 PM
Creation date
5/6/2020 2:24:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
5/6/2020
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
MT7
Email Name
ZTT
JDM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Haul Route: <br />Travel <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity <br />Time <br />(Ft) (%) (%) (fpm) <br />(min) <br />1 5144.00 3.00 3.00 6.00 1266 4.238 <br /> <br />Haul Time: minutes <br />4.238 <br />Return Route: <br />Travel <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity <br />Time <br />(Ft) (%) (%) (fpm) <br />(min) <br />1 5144.00 -3.00 3.00 0.00 3503 1.672 <br /> <br />Return Time: minutes <br />1.672 <br />Total Truck Cycle Time: minutes <br />9.390 <br /> <br />Loading Tool unit <br />Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />1,117.62 LCY/Hour Adjusted for job efficiency: 927.62 LCY/Hour <br /> <br />Optimal No. of Trucks: 4 Truck(s) Selected Number of Trucks: 4 Truck(s) <br /> <br />Adjusted hourly truck team production: 3,710.50 LCY/Hour <br />Adjusted single truck/loader team production: 3,710.50 LCY/Hour <br />Adjusted multiple truck/loader team production: LCY/Hour <br />3,710.50 <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Team(s) Total job time: Hours <br />249.90 <br /> <br /> <br />Unit cost: $1.225 /LCY Total job cost: <br />$1,135,773 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.