Laserfiche WebLink
// <br /> BATTLE MOUNTAIN RESOURCES, INC. <br /> April 21, 2020 RECEIVED <br /> APR 2 g 2020 <br /> Mr. Lucas West DIVISIONOFRECLgkq�p� <br /> MINING AND SAFETY <br /> Colorado Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Re:San Luis Project Tailing Dam Q1 2020 Inspection Report,Technical Revision No.33, Permit No. M-1988-112 <br /> Dear Mr.West: <br /> Battle Mountain Resources Inc.(BMRI) is pleased to provide the Q1 2020 San Luis Tailing Dam Inspection Report in <br /> accordance with Technical Revision No.33 to BMRI's Reclamation Permit. <br /> The Inspection was conducted by BMRI Site Manager David Carino. <br /> Enclosed with the inspection report are photos of the Tailing Impoundment facilities to include the newly <br /> constructed drop structure and the under-drain discharge area.Also included are the Q1 2020 Piezometer <br /> Inspection results. <br /> çctfuV. Madrid <br /> Sr.Supervisor Colorado Legacy Sites <br /> (719)379-0538 <br /> cc: Devon Horntvedt <br /> David Carino <br /> P.O.Box 310 • San Luis,Colorado 81152-0310 • (719)379-0798 • Fax(719)379-0713 <br />