Laserfiche WebLink
o .coto <br /> Hl; ��$ ION, MINING AND SAFETY <br /> TR02 <br /> .��. 0203 ph(303)866-3567 <br /> /876 <br /> ECS/mac RECE WD <br /> REQUEST FOR TECHNICAL REVISION ('TR) COVER SHEET APR 2 $ [UZO <br /> File No.: M- <br /> 1993-027 Site Name: Schoolfield Pit <br /> DIVISION OF RECLAMATION <br /> County Custer TR# (DRALSMINING <br /> UseAND <br /> Permittee: Seifert Enterprises LLC <br /> Operator(If Other than Permittee): same <br /> co E <br /> Permittee Representative: Kent Beach <br /> -74Please provide a brief description of the proposed revision: - <br /> Revised Mine Plan Map with corrected corners and haul road coordinates containing all v a 0 <br /> C N <br /> disturbed lands and haul road within 9.9 acre tract. ° ••1 <br /> cn <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR o <br /> the Division may require the submittal of a permit amendment to make the required or desired changes n o <br /> to the permit. E. <br /> o <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the 0 `� N <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />