Laserfiche WebLink
of cow. <br /> ( v4, <br /> it '' $z COLO TRO1 MINING AND SAFETY <br /> "/87s.* 1(303)866-3567 RECEIVED <br /> TC1/mac <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET PR 2 4 2020 <br /> 1999-003 . Tallahassee Pit DI ISIO 4cid. TION <br /> File No.: M- Site Name. Ml SAFETY <br /> County Fremont TR# <br /> (DRMS Use only) <br /> Permittee: Seifert Enterprises LLC <br /> Operator(If Other than Permittee): same <br /> Kent Beach Wo <br /> Permittee Representative: o, 3 <br /> • ca <br /> Please provide a brief description of the proposed revision: � co <br /> b <br /> Revised Legal Descripton and Mine Plan Map depicting boundary lines and coordinates N w <br /> disturbed by mining operations. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes o <br /> to the permit. :910!) 11 <br /> iso <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the N <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 171 <br /> 112 hard rock (not DMO) $175 <br /> 110d, :112d(1, 2 or 3) $1006 <br />