My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-21_HYDROLOGY - M1988112 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2020-04-21_HYDROLOGY - M1988112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 3:48:16 PM
Creation date
4/22/2020 2:46:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
4/21/2020
Doc Name
Monthly Report
From
Battle Mountain Resources
To
DRMS
Annual Report Year
2020
Report Quarter_Month
Mar
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> Battle Mountain Resources,Inc. APR 212020 <br /> San Luis Project <br /> P.O. Box 310 DIVISION OF <br /> San Luis,Colorado 81152-0310 MIONOFRECLAMATION C <br /> (719)379-0798 <br /> April 9,2020 <br /> Mr. Lucas J. West <br /> State of Colorado <br /> Colorado Department of Reclamation, Mining,& Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver,CO 80203 <br /> Re: Battle Mountain Resources, Inc. <br /> San Luis Project- M-88-112 <br /> March 2020 Monthly Report <br /> Dear Mr. West: <br /> The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI) <br /> "San Luis Project" (M-88-112) for the month of March 2020. Surface and groundwater monitoring and <br /> analysis were completed for all the required sites during the month as specified in the TR-32 Quality <br /> Assurance and Quality Control (QA/QC) Plan. The end of March water level, piezometer, lysimeter and <br /> other observation data was not collected until the first week in April due requirements for employee <br /> quarantines due to COVID-19. <br /> Tailing Facility/Leak Detection System <br /> The six lysimeters which are a part of the Lined Tailing Facility(LTF)leak detection system were inspected <br /> and verified for proper vacuum and operation. As shown in Table 1,there was no pore space water found <br /> to be present in any of the six lysimeter collection pans,therefore, no sampling or laboratory analysis was <br /> required. <br /> Table 1 —Monthly Lysimeter Monitoring <br /> Lysimeter Identification Observation Date Depth to Water(feet) <br /> LS 1 R2 04/02/2020 DRY <br /> LS2R2 04/02/2020 DRY <br /> LS3R 04/02/2020 DRY <br /> LD1 R2 04/02/2020 DRY <br /> LD2R2 04/02/2020 DRY <br /> LD3R 04/02/2020 DRY <br /> The ten piezometers located on the tailing impoundment main embankment were inspected and measured <br /> for depth to water. The depths to water found for each piezometer are shown in Table 2. All piezometers <br /> were either dry or contained less than twelve inches of water. <br />
The URL can be used to link to this page
Your browser does not support the video tag.