My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-15_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2020-04-15_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 6:50:28 AM
Creation date
4/17/2020 6:40:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
4/15/2020
Doc Name
Request for Technical Revision
From
Ouray Silver Mines, Inc.
To
DRMS
Type & Sequence
TR11
Email Name
LJW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Privileged and Confidential—Attorney Client Communication Geosyntee''' <br /> consultants <br /> design assumptions for each process listed in Table 9. The system design assumes <br /> gravity flow through the process after the initial pumping into the Hybrid MWP. <br /> Table 9:Pilot-Scale Design in the Work Plan <br /> Design Recommendations in‘York Plan <br /> • OSMI rented a unit that is a pre-engineered 10 to 20 gpm pilot- <br /> Hybrid MWP scale mobile unit with chemical feed,coagulation,flocculation, <br /> and sedimentation treatment capabilities(See Appendix B) <br /> • Two 55-gallon barrels in parallel <br /> Aerobic • Volume: approximately 14 ft3(the size of this wetland will be <br /> Wetland* dependent on reconfiguration of MWP) <br /> • Materials of construction: sand/gravel mixture,native wetland <br /> vegetation <br /> • At least a 3,000-gallon tank <br /> • Depth: —7 feet <br /> • Locally sourced materials of construction: 5%manure,30% <br /> SRB Tank 1 woodchips (potentially beetle-kill), 15%hay,20%limestone,30% <br /> gravel <br /> • Effluent piping needs to be constructed to hold 6 to 12 inches of <br /> water on top of the SRB material mix at all times to keep SRB <br /> anaerobic <br /> • At least a 3,000-gallon tank <br /> • Depth:—7 feet <br /> • Locally sourced materials of construction: 5%manure,30% <br /> SRB Tank 2 woodchips(potentially beetle-kill), 15%hay,20%limestone,30% <br /> gravel <br /> • Effluent piping needs to be constructed to hold 6 to 12 inches of <br /> water on top of the SRB material mix at all times to keep SRB <br /> anaerobic <br /> • Two 275-gallon totes for each train <br /> • Volume of each train: approximately 72 ft3 <br /> Anaerobic <br /> Wetlands 1 and 2* <br /> • Materials of construction: sand/woodchip/corn stover mixture, <br /> native wetland vegetation <br /> • Install piping to keep anaerobic at all times <br /> Aerobic Wetland • Two 55-gallon barrels for each train <br /> Polishing and • Volume of each train: approximately 14 ft3 <br /> Outfall 002A* <br /> 1'reatahilitc l estin2 Report 16 December 11,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.