My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-15_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2020-04-15_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 6:50:28 AM
Creation date
4/17/2020 6:40:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
4/15/2020
Doc Name
Request for Technical Revision
From
Ouray Silver Mines, Inc.
To
DRMS
Type & Sequence
TR11
Email Name
LJW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ourav Silver Mines Inc. Table 2 <br /> Technical Revision 11 <br /> Table 2. Sampling Frequency, Field Parameters for Sampling Locations <br /> Laboratory <br /> Station ID Station Type Status Sampling Frequency Paramter List Field Parameters <br /> SW-1 <br /> SW-2 <br /> SW-3 <br /> pH,Temperature, Specific Conductivity, Oxidation <br /> SW-4 Surface Water Voluntary Voluntary Surface Water <br /> Reduction Potential, Dissolved Oxygen, Flow Rate <br /> SW-15 <br /> SW-16 <br /> SW-17 <br /> GW-1A <br /> GW 1B Quarterly <br /> GW-2A <br /> GW-2B Groundwater Required Quarterly Groundwater pH,Temperature, Depth to Groundwater <br /> GW-3R <br /> GW-3B <br /> GW-4 Quarterly2 <br /> UG-1 Voluntary Inactive <br /> UG-2 Required Quarterly3 <br /> UG-3 Voluntary Inactive <br /> UG-4 Required Annual <br /> UG-5 Required Quarterly <br /> UG-6 Mine Water Voluntary Inactive Groundwater pH,Temperature, Flow Rate, Oil and Grease Visual <br /> UG-7 Voluntary Voluntary <br /> UG-8 Required Quarterly3 <br /> UG-9 Voluntary Voluntary <br /> UG-10 Required Annual <br /> Notes: <br /> 1. No sampling required until the Atlas Tailing Facility is disturbed. Quarterly sampling required thereafter per Nov. 13, 2015 communication. <br /> 2. Quarterly once constructed <br /> 3. Annual sampling until mine production begins. Quarterly sampling required thereafter. <br /> Page 1 3/26/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.