Laserfiche WebLink
DRAFT <br /> Table 6 Dissolved Iron, Selenium and Uranium in Non-Compliance Wells and <br /> Piezometers <br /> WELL IRON SELENIUM URANIUM <br /> PIEZOMETER COLLECTION DATE MG/L UG/L UG/L <br /> MW-05 17-Jul-19 0.1 16 8.3 <br /> MW-05 08-Oct-19 0.12 29 24 <br /> MW-07 17-Jul-19 ND 10 0.86 <br /> MW-07 09-Oct-19 0.17 10 1.3 <br /> MW-08 06-Jun-19 ND 29 <br /> MW-08 17-Jul-19 0.1 24 <br /> MW-08 08-Oct-19 0.1 10 21 <br /> MW-09 17-Jul-19 ND 12 23 <br /> MW-09 09-Oct-19 ND 22 <br /> P-1 06-Jun-19 ND 25 38 <br /> P-1 16-Jul-19 0.12 12 28 <br /> P-1 09-Oct-19 ND 13 24 <br /> P-2 25-Apr-19 0.1 18 29 <br /> P-2 16-Jul-19 0.1 17 28 <br /> P-2 09-Oct-19 ND 14 27 <br /> P-3 06-Jun-19 ND 10 34 <br /> P-3 16-Jul-19 0.1 29 31 <br /> P-4 06-Jun-19 ND 30 <br /> P-4 16-Jul-19 ND 15 22 <br /> Table 7 Field Measured Ferric and Total Iron <br /> FERRIC IRON <br /> COLLECTION FERROUS IRON (Fe2+) TOTAL IRON (FE'+) Est. <br /> WELL NAME DATE MG/L MG/L MG/L <br /> KMW-02 22-Aug-19 0.15 0.14 0 <br /> KMW-05 _ 22-Aug-19 3.3 3.52 0.22 <br /> KMW-06 - 22-Aug-19 1.55 1.88 0.33 <br /> KMW-07 22-Aug-19 1.4 1.9 0.5 <br /> KMW-08 22-Aug-19 0.32 0.38 0.06 <br /> KMW-09 22-Aug-19 0.09 0.12 0.03 <br /> KMW-10 22-Aug-19 0.09 0.13 0.04 <br /> KMW-12 22-Aug-19 0.1 0.13 0.03 <br /> KMW-13 22-Aug-19 2.5 3.04 0.54 A <br /> Loveland Ready-Mix Concrete 29 December 20/9 <br /> TELE S T O <br />