My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-13_REVISION - M1993035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993035
>
2020-04-13_REVISION - M1993035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:12 PM
Creation date
4/15/2020 5:38:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993035
IBM Index Class Name
REVISION
Doc Date
4/13/2020
Doc Name
Request for Technical Revision
From
Summit County
To
DRMS
Type & Sequence
TR4
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o4'ep'to <br /> c " 9G <br /> s.fy�,T1 *. COLORADOTRO4 AVIATION, MINING AND SAFETY <br /> 1.876 * 1313 Sherr _- orado 80203 ph(303)866-3567p�RECEIVED <br /> EIVED <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET APR 13 2Q <br /> 1993-035 Swan River Resource * `' Wi6 <br /> File No.: M- Site Name: DIVISION TION <br /> WING NDWEN <br /> County Summit TR# (DRMS Use only) <br /> Permittee: <br /> Summit County Government <br /> Operator(If Other than Permittee): Summit County and Town of Breckenridge `3 E <br /> Summit County Government - Brian Lorch ca <br /> p. <br /> Permittee Representative: a w <br /> b <br /> Please provide a brief description of the proposed revision: cnu+ <br /> Revise reclamation approach to allow for reclamation to a pre dredge mining condition, i.e., restoration of a <br /> stream channel and riparian corridor. Please see the attached documents for additional information. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes I� <br /> to the permit. o <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.