My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-10_HYDROLOGY - M1999005
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999005
>
2020-04-10_HYDROLOGY - M1999005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 6:50:58 PM
Creation date
4/14/2020 7:46:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999005
IBM Index Class Name
Hydrology
Doc Date
4/10/2020
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
DC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nathan Phelps <br /> April 10, 2020 <br /> Page 2 of 5 <br /> that result from mining related exposure of groundwater. The DRMS letter identified four <br /> approaches to satisfy this requirement. In accordance with approach nos. 1 and 3, you have <br /> indicated that a bond has been obtained for $175,334 through the DRMS to assure that <br /> depletions from groundwater evaporation do not occur in the unforeseen event, or events, <br /> that would lead to the abandonment of the North River Pit. <br /> DEPLETIONS <br /> Since no mining is planned during 2020, pond evaporation will be the only water demand at <br /> the site. The total water surface area for the two ponds at the site was measured from the <br /> 2019 aerial photograph (Figure 2, attached) and was found to be 7.42 acres. For the purposes <br /> of this SWSP, the evaporation from the 7.42 acres was calculated as 29.83 acre-feet/year, <br /> based on a net annual evaporation of 4.02 feet from the Lower Arkansas Water Management <br /> Association's ("LAWMA") decree in Case No. 02CW181. A Glover analysis was used to estimate <br /> the timing of stream depletions with the following parameters: <br /> Transmissivity (T): 142,000 gpd/ft <br /> Specific Yield (S): 0.2 <br /> Distance from centroid of cell <br /> to the river (X): 760 feet (northern cell) <br /> 370 feet (southern cell) <br /> Aquifer Width (W): 5,455 feet <br /> According to the Glover analysis, 95 percent of depletions were modeled to accrue to the <br /> stream within the first 8 months; therefore, an 8 month unit response function will be used to <br /> calculate lagged depletions for the purposes of this SWSP, as shown below: <br /> Unit Response Function <br /> Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 <br /> Northern Cell 0.6185 0.2108 0.0569 0.0351 0.0276 0.0209 0.0170 0.0132 <br /> Southern Cell 0.8260 0.1183 0.0267 0.0163 0.0127 <br /> Since 95% of the depletions occurred within the first eight months for the northern cell and <br /> the first 5 months for the southern cell, the last 5% of the lagging factors were wrapped. The <br /> lagged stream depletions are calculated as 28.76 acre-feet/year (column 10 of attached Table <br /> 1). The carry-over lagged depletion associated with the surface area during the previous plan <br /> year was calculated separately as 1.11 acre-feet and then added to the lagged depletions for <br /> the current plan year. The resulting total stream depletion associated with the gravel pit is <br /> estimated to total 29.87 acre-feet (column 12 of attached Table 1). <br />
The URL can be used to link to this page
Your browser does not support the video tag.