My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-10_REVISION - M1992009
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992009
>
2020-04-10_REVISION - M1992009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 6:48:50 PM
Creation date
4/10/2020 1:51:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992009
IBM Index Class Name
Revision
Doc Date
4/10/2020
Doc Name
Request for Technical Revision
From
Gillette Sand and Gravel, Inc./Realtime Aquifer Services
To
DRMS
Type & Sequence
TR8
Email Name
JDM
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pond water levels (and corresponding sediment load) will be visually monitored and recorded weekly by <br /> on-site personnel using a staff gauge. Records of the visual measurements will be maintained on-site. A <br /> copy of the form to be used for pond level monitoring and sediment removal is included with this TR. <br /> When process water levels approach the minimum freeboard(three feet), sediment will be excavated from <br /> each of the ponds as necessary to return them to acceptable operational levels. To avoid interaction of the <br /> process water with groundwater, the sediment pond will not be excavated beyond the base of the existing <br /> ground surface. The excavated pond sediment is used as subbase fill in the reclamation process, where it <br /> will be placed as needed, graded, then covered with topsoil and seeded in accordance with the <br /> Reclamation Plan. <br /> Reclamation <br /> Affected areas will be reclaimed within eight months after completion of mining so as to coincide with <br /> summer and fall months in accordance with the reclamation plan(Exhibit E of the Permit). The remaining <br /> period of active mining is estimated to be 20 years. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.