Laserfiche WebLink
-4- <br /> 12. Primary future Post-minin land use check one): <br /> Cropland(CR) F-1 Pastureland(PL) F� General Agriculture(GA) <br /> D Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary resent land use check one <br /> C[ Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> II Rangeland(RL) _E1 Forestry(FR) �( Wildlife Habitat(WL) <br /> Residential(RS) F-1 Recreation(RC) - Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Surface mining; drill, blast, load, and haul methods <br /> 15. On Site Processing: _Z Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g. truck/shovel): <br /> Surface mining; drill, blast, load, and haul; crushing and screening systems <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> Diesel, grease, and lubricants for mobile equipment <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> The amendment is being submitted to increase the permitted acreage. That will allow us to <br /> increase gypsum resources and reserves, and areas for waste dumps. <br /> Re designing the Nerth East wall at the quarry fer geeteehnieal espeeifieafiens and future <br /> reclamation, will increase total stripping by 40%. <br />