My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-06_HYDROLOGY - M1977151
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977151
>
2020-04-06_HYDROLOGY - M1977151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 6:39:10 PM
Creation date
4/7/2020 2:31:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977151
IBM Index Class Name
Hydrology
Doc Date
4/6/2020
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table No.5 <br /> Applegate <br /> R.M.Hiner Construction Co.,Inc. <br /> Greeley Pit(M-1977-151) Group,inc. <br /> GIC Direct Surface RF Factor= 23.7% per Poudre Prairie Decree River Transit Loss= 0.25% per mile <br /> Fossil Creek Surface RF Factor= 20.1% per Poudre Prairie Decree Aurora Lease Transit Distance= 66.0 miles <br /> Number of GIC Shares in SWSP= 6.25 Aurora Lease Transit Loss= 16.50% Date Revised: 3/3/2020 <br /> Water Balance AG Job#: 09-131 <br /> GIC Direct Flow Fossil Creek Reservoir Bucklen Pit <br /> Projected Estimated Projected Estimated Estimated Total SWSP Aurora Aurora Net Affect <br /> Month Augmentation GIC Direct GIC Direct Fossil Creek Fossil Creek GIC Credit Excess Credit Lease Lease to River <br /> Requirement Deliveries Credit Deliveries Credit for all shares Lease Amount Credit <br /> [ac-ft] [ac-ft/share] [ac-ft/share] [ac-ft/share] [ac-ft/share] [ac-ft] [ac-ft] [ac-ft] [ac-ft] [ac-ft] <br /> (A) (B) (C) (D) (E) (F) (G) (H) (1) (J) <br /> Apr-20 6.57 1.69 1.29 0.03 0.02 8.21 0.00 1.64 <br /> May-20 8.72 3.38 2.58 0.00 0.00 16.12 0.00 7.40 <br /> Jun-20 11.19 3.29 2.51 0.06 0.05 15.99 0.00 4.80 <br /> Jul-20 13.50 3.33 2.54 0.31 0.25 17.43 0.00 3.93 <br /> Aug-20 13.79 3.08 2.35 0.61 0.49 17.73 0.00 3.95 <br /> Sep-20 11.88 3.09 2.36 0.18 0.14 15.63 0.00 3.76 <br /> opt-20 9.69 2.45 1.87 0.00 0.00 11.68 0.00 1.99 <br /> Nov-20 7.00 0.00 0.00 0.00 0.00 0.00 8.4 7.01 0.01 <br /> Dec-20 4.60 0.00 0.00 0.00 0.00 0.00 5.6 4.68 0.08 <br /> Jan-21 3.21 0.00 0.00 0.00 0.00 0.00 3.9 3.26 0.05 <br /> Feb-21 3.92 0.00 0.00 0.00 0.00 0.00 4.7 3.92 0.01 <br /> Mar-21 5.24 0.00 0.00 0.00 0.00 0.00 6.3 5.26 0.02 <br /> Year 1 Total 99.31 20.31 15.50 1.19 0.95 102.80 0.0 28.9 24.13 27.62 <br /> Apr-21 6.95 1.69 1.29 0.03 0.02 8.21 0.00 1.26 <br /> May-21 9.16 3.38 2,58 0.00 0.00 16.12 0.00 6.96 <br /> Jun-21 11.70 3.29 2.51 0.06 0.05 15.99 0.00 4.29 <br /> Jul-21 14.06 3.33 2.54 0.31 0.25 17.43 0.00 3.37 <br /> Aug-21 14.38 3.08 2.35 0.61 0.49 17.73 0.00 3.35 <br /> Sep-21 12.47 3.09 2.36 0.18 0.14 15.63 0.00 3.16 <br /> Oct-21 10.26 2.45 1.87 0.00 0.00 11.68 0.00 1.43 <br /> Nov-21 7.5 2 0.00 0.00 0.00 0.00 0.00 9.1 7.60 0.08 <br /> Dec-21 5.09 0.00 0.00 0.00 0.00 0.00 6.1 5.09 0.00 <br /> Jan-22 3.65 0.00 0.00 0.00 0.00 0.00 4.4 3.67 0.02 <br /> Feb-22 4.33 0.00 0.00 0.00 0.00 0.00 5.2 4.34 0.02 <br /> Mar-22 5.63 0.00 0.00 0.00 0.00 0.00 6.8 5.68 0.05 <br /> Year 2 Total 105.19 20.31 15.50 1.19 0.95 102.80 0.0 31.6 26.39 24.00 <br /> Notes: <br /> (A)Augmentation requirement equal to lagged depletions from Table 3 plus return flow obligations from Table 4 <br /> (B)GIC projected deliveries for Year One of Projection-Decree Case No.03CW348 <br /> (C)Estimated GIC direct flow consumptive use credit per share.Calculated by removing surface return flow obligations from deliveries <br /> (D)Fossil Creek[rpkected deliveries for Year One of Projection,Decree Case No.03CW348 <br /> (E)Estimated Fossil Creek consumptive use credit per share.Calculated by removing surface return flow obligations from deliveries <br /> (F)Total GIC credit for all shares=[(C)+(E)]*(Number of GIC Shares in SWSP) <br /> (G)Bucklen Pit SWSP excess credit lease during period April through October.Due to location,no transit loss assesed <br /> (H)Aurora lease during the period November through March.Due to location,transit losses are assesed <br /> (I)Aurora Lease Credit=(H)*(1-PRPA Lease Transit Loss) <br /> (J)Net Affect to River=(F)+(G)+(1)-(A) <br /> N:\09131 Rex Hiner-Greeley Pit SWSP\Disciplines(Technical)\WRPM\Water Rights\SWSP\2020 SWSP\Greeley Pit 2020 SWSP(2 year request) <br />
The URL can be used to link to this page
Your browser does not support the video tag.