Laserfiche WebLink
Table N o.2 Applegate <br /> R.M.Hiner Construction Co.,Inc. <br /> Greeley Pit(M-1977-151) Group, inc. <br /> Moisture Content of Product= 4% by weight <br /> Water Used for Dust Control= 1.0 acre-foot per year <br /> Sand&Gravel Specific Weight= 125 Ib/ft3(http://www.reade.com/Particle_Briefings/spec_gra2.htm1) <br /> Sand&Gravel Porosity= 45% (estimated by operator) <br /> Date Revised: 3/3/2020 <br /> Operational Consumptive Use(aka Operation CU) AG Job#: 09-131 <br /> From Mining <br /> Month Monthly Water Retained Intermittent Water Used Operation <br /> Production in Product Fill Volume for Dust Control CU <br /> [tons] [ac-ft] [ac-ft] [ac-ft] [ac-ft] <br /> (A) (B) (C) (D) (E) <br /> Apr-20 0 0.00 0.00 0.10 0.10 <br /> May-20 0 0.00 0.00 0.15 0.15 <br /> Jun-20 0 0.00 0.00 0.20 0.20 <br /> J u I-20 0 0.00 0.00 0.25 0.25 <br /> Aug-20 0 0.00 0.00 0.20 0.20 <br /> Sep-20 0 0.00 0.00 0.10 0.10 <br /> Oct-20 0 0.00 0.00 0.00 0.00 <br /> Nov-20 0 0.00 0.00 0.00 0.00 <br /> Dec-20 0 0.00 0.00 0.00 0.00 <br /> Jan-21 0 0.00 0.00 0.00 0.00 <br /> Feb-21 0 0.00 0.00 0.00 0.00 <br /> Mar-21 0 0.00 0.00 0.00 0.00 <br /> Year 1 Total 0 0.00 0.00 1.00 1.00 <br /> Apr-21 0 0.00 0.00 0.10 0.10 <br /> May-21 0 0.00 0.00 0.15 0.15 <br /> Jun-21 0 0.00 0.00 0.20 0.20 <br /> J u I-21 0 0.00 0.00 0.25 0.25 <br /> Aug-21 0 0.00 0.00 0.20 0.20 <br /> Sep-21 0 0.00 0.00 0.10 0.10 <br /> Oct-21 0 0.00 0.00 0.00 0.00 <br /> Nov-21 0 0.00 0.00 0.00 0.00 <br /> Dec-21 0 0.00 0.00 0.00 0.00 <br /> Jan-22 0 0.00 0.00 0.00 0.00 <br /> Feb-22 0 0.00 0.00 0.00 0.00 <br /> Mar-22 0 0.00 0.00 0.00 0.00 <br /> Year 2 Total 0 0.00 0.00 1.00 1.00 <br /> Notes: <br /> (A)Estimated monthly production volumes provided by operator <br /> (B)Water Retained in Product=[(Moisture Content of Product)*(A)*2000]/(62.4*43560) <br /> (C)Intermittent Fill Volume=(Volume of Mined Material)x(1-Porosity)-(B). Mine material volume estimated using specific weight of material. <br /> (D)Water Used for Dust Control is estimated to be 1 acre-foot per year and is distributed according to monthly production volumes <br /> (E)Operation CU=(B)+(C)+(D) <br /> N:\09131 Rex Hiner-Greeley Pit SWSP\Disciplines(Tech nical)\WRPM\Water Rights\SWSP\2020 SWSP\Greeley Pit 2020 SWSP(2 <br /> year request) <br />