Laserfiche WebLink
Project Name: Sunday Mines Group Ore Pads TRAUTN ER lel I'i_I.I' :m <br /> Project No: 55941 MT <br /> Page 2 <br /> NUCLEAR FIELD DENSITY TEST RESULTS <br /> Standard <br /> Probe Optimum Field Field Relative <br /> Test Proctor Material <br /> Date Test Test Location Depth <br /> Elevation Density Moisture Density Moisture Compaction Type Technician <br /> No. (in) (PCF) (%) (PCF) (%) (%) <br /> 2-25-20 21 West Sunday Mine Ore Pad—ramp 6 Top of fill 124.9 6.2 123.7 6.0 99 Existing Tailing for Ore Pads P.Kibel <br /> 6 ft from bottom and 3 ft from west berm for ramp <br /> 2-25-20 22 W Sunday Mine Ore Pad—anchor trench backfill 6 Top of 124.9 6.2 122.3 5.8 98 Existing Tailing for Ore Pads P.Kibel <br /> Top of ramp and 4 ft from east berm backfill <br /> 2-25-20 23 <br /> West Sunday Mine Ore Pad—final cover 6 Top of final 124.9 6.2 125.1 5.7 100 Existing Tailing for Ore Pads P.Kibel <br /> 6 ft north and 8 ft east of SW corner cover <br /> 2-25-20 24 West Sunday Mine Ore Pad—final cover 6 Top of final 124.9 6.2 123.8 5.7 99 Existing Tailing for Ore Pads P.Kibel <br /> 8 ft south and 8 ft west of NE corner cover <br /> THE CHARACTERISTICS REPORTED ABOVE ARE ONLY APPROPRIATE FOR THE ELEVATIONS AND LOCATIONS TESTED DURING OUR FIELD WORK. <br /> 649 Tech Center Drive Suite A • Durango, CO 81301 • 970/259-5095 • 95 N. Henry Street • Cortez, CO 81321 • 970/529-2020 <br />