Laserfiche WebLink
6.3.3 EXHIBIT C-Mining Plan <br /> McCormick Excavation And Paving LLC(Applicant) McCormick Pit 1 <br /> A. Mining for aggregates will commence this spring of 2020.There should be enough material to <br /> last to the year 2030. <br /> B. The estimated topsoil depth is approximately 4"-6".We will strip topsoil and stockpile it as we <br /> begin mining.As the operations move,we will start the reclamation process.We will place <br /> overburden where we have already mined and place topsoil. <br /> C. Overburden is 1'to 4'in depth.There are no wasted rocks on project. <br /> D. Deposits range from 8'to 13' in depth. <br /> E. There is an entrance not being used that we will put a cattle guard in so trucks don't have to <br /> watch for livestock. No new entrances or no office or shop/maintenance buildings there.There <br /> might be a portable mobile concrete or asphalt plant setup if work is permitted in area. <br /> F. Disturbance dimensions to the land surface will be contained in mining permit area and those <br /> dimensions are 600 feet by 400 feet(240,000 SF).as shown in maps. Inside this area will be <br /> area mined and stockpile for top soil,overburden and entrance, haul road will be 25 ft wide x <br /> 125 ft long.Top soil will be placed on the outskirts of pit just inside the boundary to create a <br /> protective berm and divert water around the pit.The over burden will be placed on the north <br /> side of the pit. <br /> G. There will be no new roads added, nor will there need to be any roads improved.We will add a <br /> Cattle guard in place of gate.The entrance is there hasn't been used.The road will be 25 ft wide <br /> By 120 ft long.This road will receive additional gravel to help with additional traffic. It will be left <br /> In operational when pit is closed,due to it was already existing.This will be a safer entrance for <br /> the land owner to use. There will be no drainage and runoff conveyance structures added. <br /> H. Proposed site is a dry site. No dewatering is needed and no water is required for mining.The <br /> only water that would be needed is for dust control.With the small amount of operations at this <br /> site,there shouldn't be any dust control needed. But if there would be 4,000 gallons of water <br /> should be sufficient for dust control for the day.That water would be gotten from the nearest <br /> town. <br /> I. No ground water will be encountered. Water levels in the area are a minimum 300' in depth. <br /> There should be no surface water intercepted as mining area is on top of the hill.We will put a <br /> berm around the permitted area to divert any surface water created by rain. No chemicals will <br /> be used at this location. <br />