Laserfiche WebLink
At\ <br /> ,f,, �t co. 4INING TRO6 AND SAFETY <br /> \.,....,.„ 303)866-3567 <br /> `'4876` DMC/thm(awa) <br /> RECEIVED <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET MAR 2 4 2020 <br /> File No.: M- 1999-058 Site Name:The Pride of America Mir ISIONOFRECLAMATION <br /> Gunnison MINING AND SAFETY <br /> County TR# (DRMS Use only) <br /> Permittee:Colorado Stone Quarries <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Katie Todt, Lewicki and Associates 7 3 3 <br /> o = co <br /> Please provide a brief description of the proposed revision: f b <br /> TR-06 Change of location for the main fueling area from Portal #4 to the Franklin Pad. 0 N M W <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or applicati, <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submit <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a <br /> the Division may require the submittal of a permit amendment to make the required or desired chang <br /> to the permit. ; _4 <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the g° o <br /> Y 0) <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 El <br />