Laserfiche WebLink
MINING PLAN EXIBIT C (CONT) <br /> A large stockpile of specification rock will be created on the <br /> site as mining progresses. Once there is an adequate supply, the <br /> processing will be shut down and the material will be removed as <br /> needed. We expect the mine to operate year around with periods <br /> of inactivity when adverse weather conditions exist. <br /> We expect to have 9. 1 acres +/- or less disturbed at any one <br /> time. The bond estimate presented on page 26 shows the amount of <br /> land we will disturb at a worse case scenario. At the end of a <br /> sorting operation, if there are any vertical faces on the <br /> existing stockpiles they will be reduced to 3h to lh so no slope <br /> grading will be necessary if operations end prematurely. The <br /> floor of the mine will be graded to pre stockpile level. <br /> Little or no water will be used at the site. If dust control <br /> water is used it will be obtained from on site water provided by <br /> the land owner for that purpose. We will make sure it is an <br /> approved source for our use. We expect to need less than 1 acre <br /> foot of water per year. <br /> 24 <br />