My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-19_REPORT - C1981010 (7)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2020-03-19_REPORT - C1981010 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 7:58:03 AM
Creation date
3/20/2020 2:02:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
3/19/2020
Doc Name Note
2019 Annual Hydrology Report
Doc Name
Annual Hydrology Report
From
Trapper Mining, Inc.
To
DRMS
Annual Report Year
2019
Email Name
RAR
JLE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 GROUND-WATER LEVELS <br /> Water level or water pressure has been measured in 26 wells at Trapper Mine in 2019. <br /> Wells GD-2, GF-4, GP-3 and GP-4 were flowing wells in 2019 and pressure readings on these wells <br /> have been converted to static water head in feet above the measuring point. The water levels are <br /> prefixed by a negative sign to indicate a water level above the land surface. Wells GA-1 and GA-2 <br /> were destroyed by mining in 1996 (see Hydro-Engineering, L.L.C., 1997 for where these two wells <br /> were located) and well GP-1 was destroyed by mining in 2003 (see Hydro-Engineering, LLC 2003). <br /> Monitoring of wells GB-1, GB-2, GB-5, GF-I, GF-2 and GF-3 ceased at the end of 2003. Wells <br /> 81-03A, GE-1, GE-2, GE-3, GLUX-1 and GP-6 ceased monitoring in mid-2006 after their removal <br /> from monitoring. <br /> The locations of the monitoring wells are shown on enclosed Maps No. 2-1 through 2-3. <br /> Well GD-1(2) is completed in the Twenty Mile Sandstone. Four wells, GD-2, GF-6, GLEV-1 and <br /> GP-5 are used to monitor the QR aquifer. Wells GD-3 and GF-I I are completed in backfill derived <br /> from the QR aquifer and,therefore, are also used to monitor the QR aquifer. Wells GP-2, GP-4, and <br /> GP-8 are used to monitor the KLM aquifer. Six wells, GC-I, GF-4, GLEV-3, GP-3, GP-7, and <br /> GMP-1 are used to observe changes in the HI aquifer. Wells GF-5 and GF-7 are completed in <br /> backfill material derived from the HI aquifer and are also used to monitor the HI aquifer. Wells GC- <br /> 2, P-8, and GP-9 are used to monitor the 3rd White Sandstone aquifer. Well P-5 is completed in the <br /> 2nd White Sandstone between the G and F coals. Well P-3 was perforated in the Lewis Shale and <br /> monitoring of this well ceased in late 2016. Five alluvial wells, COY, GC-3, GLEV-2, P-1 and J-1, <br /> are used to monitor the Flume, Deacon, Pyeatt, and Johnson alluviums with two of these wells <br /> completed in the Flume alluvium. <br /> Trapper Mining Company 2-1 <br /> 2019 Annual Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.