Laserfiche WebLink
Colowyo Coal Company L.P. <br /> III. Summary of Reclamation and Management <br /> A. General Description <br /> As shown on Map 1, 44.6 acres is requested for Phase I bond release and is located in the West <br /> Pit. The areas were backfill and graded in 2019. The bond release areas are comprised of two <br /> distinct parcels divided by a permanent post-mine channel. <br /> The work completed included in this parcels is regrading to the approved post-mining <br /> topography and construction of post-mining drainage channel. The reclaimed area has been <br /> regraded consistent with the approved post-mining topography (See Map 19 in Permit No. C- <br /> 1981-019 for the approved post-mining topography), and follows all criteria set forth for Phase I <br /> bond release by the Division. Please refer to Map 1 also for a representative cross-sections of <br /> the backfilled and regraded areas in relation to the approved post-mining topography. <br /> A permanent post-mine channel segment have been established wihthin to these Phase I bond <br /> release parcels in accordance with the approved construction design parameters located in Permit <br /> No. C-1981-019. This reconstructed channel segment is not being applied for release under this <br /> application as the entire watershed reporting to this structures has not been reclaimed to date. <br /> SL-18 Phase I Bond Release Application Page 4 <br />