Laserfiche WebLink
-4- <br /> 12. Prima future(Post-mining)land use(check one): <br /> Cropland(CR) D Pastureland(PL) General Agriculture(GA) <br /> ri Rangeland(RL) n Forestry(FR) Wildlife Habitat(WL) <br /> El Residential(RS) El Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) 11 Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one : <br /> 0 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> 11 Rangeland(RL) Forestry(FR) �� Wildlife Habitat(WL) <br /> BResidential(RS) Recreation(RC) 1 Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Surface mining; drill, blast, load, and haul methods <br /> 15. On Site Processing: IS Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Surface mining; drill, blast, load, and haul; crushing and screening systems <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> Diesel, grease, and lubricants for mobile equipment <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> The amendment is being submitted to increase the permitted acreage. That will allow us to <br /> increase gypsum resources and reserves, and areas for waste dumps. <br /> Rc designing the North East wall at the quarry for gcotcchnical cspccifications and future <br /> reclamation, will increase total stripping by 40%. <br />