Laserfiche WebLink
Loveland Ready-Mix Concrete, Inc. March 11, 2020 Attachment 2 <br /> Larimer Pit- M1974-069 <br /> Response to Bond Calculation submitted with Inspection Report 2/19/2020 <br /> Task Description LRM Revision Cost <br /> 001 Backfill 4 Acres Cell 14 Remove-not required $ - <br /> 002 Grade Cell 14 Backfill Area No Change $ 1,942 <br /> 003 Retopsoil Cell 14 Backfill Area No Change $ 12,097 <br /> 004 Revegetate Cell 14 Backfill Area No Change $ 26,706 <br /> 005 Interseed Cell 18 Weed Control only $ 2,807 <br /> 006 Interseed Cell 19 No Change $ 5,037 <br /> 007 Revegetate Cell 8 No Change $ 35,713 <br /> 008 Revegetate Cell 7 Southern Shore Line No Change $ 5,378 <br /> 009 Backfill 1 acre Cell 5 Remove- not required $ - <br /> 010 Retopsoil Cell 5-perimeter No Change $ 1,172 <br /> 011 Revegetate Cell 5 No Change $ 8,174 <br /> 012 Backfill 1 acre Cell 6 Remove-not required $ - <br /> 013 Retopsoil Cell 6-perimeter No Change $ 1,398 <br /> 014 Revegetate Cell 6 No Change $ 7,851 <br /> 015 Backfill 1 acre pit south of Cell 6 Reduce to 0.25 acres $ 14,498 <br /> 016 Retopsoil 1.35 acre area south Cell 6 No Change $ 1,754 <br /> 017 Revegetate 1.35 acre area south Cell 6 No Change $ 2,904 <br /> 018 Rip 2.7 acre storage area south Cell 5 No Change $ 1,065 <br /> 019 Retopsoil 2.7 acre storage area south Cell 5 No Change $ 3,162 <br /> 020 Revegetate 2.7 acre storage are south Cell 5 No Change $ 5,808 <br /> 021 Backfill 11 Acres Cell 20 Remove- not required $ - <br /> 022 Retopsoil 4.5 Acres Cell 20 Revise $ 4,981 <br /> 023 Revegetate 6.5 Acres Cell 20 Revise $ 14,618 <br /> 024 Backfill Cell 21 overburden (AM-3) No Change $ 27,486 <br /> 025 Shalestone lining Cell 21 (AM-3) No Change $ 4,997 <br /> 026 Retopsoil Cell 21 (AM-3) No Change $ 1,243 <br /> 027 Final Grading Cell 21 (AM-3) No Change $ 2,837 <br /> 028 Revegetate 28 acres Cell 21 (AM-3) No Change $ 62,968 <br /> 029 Compact/QC Lining Cell 21 No Change $ 165,000 <br /> 030 Mobilization No Change $ 50,823 <br /> $ 472,419 <br /> 0& P Revised $ 64,447 <br /> Legal, Engineering, Project Management Revised $ 50,160 <br /> TOTAL BOND AMOUNT Revised $ 587,027 <br />