Laserfiche WebLink
March 9,2020 C-1994-082/Yoast Mine RAR <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N - Air Resource Protection R - Roads <br /> N - Availability of Records N - Reclamation Success <br /> N - Backfill& Grading N - Revegetation <br /> N - Excess Spoil and Dev. Waste N - Subsidence <br /> N - Explosives N - Slides and Other Damage <br /> N - Fish&Wildlife N - Support Facilities On-site <br /> R - Hydrologic Balance N - Signs and Markers <br /> R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N - Processing Waste N - Topsoil <br /> COMMENTS <br /> This was a partial inspection of the Yoast Mine, C 1994082,operated by Seneca Property LLC. The inspection <br /> was conducted, and the report prepared by me,Robin Reilley of the DRMS. The weather was clear with <br /> temperatures 35 degrees F. The roads are not plowed, and the site was inaccessible at the time of inspection. <br /> UPCOMING PERMITTING ACTIONS: <br /> 1. Summer 2020 bond release. <br /> 2. Permit Renewal RN5 in progress. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Main haul roads were snow covered and impassable throughout the site. <br /> ROADS Rule 4.03 Construction 4.03.1(3), 4.03.2(3);Drainage 4.031(4), 4.03.2(4); Surfacing and <br /> Maintenance 4.03.1(5)and(6) 4.03.2(5)and(6). <br /> o Roads in and around the facilities were snow covered and impassable. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 2 of 3 <br />