Laserfiche WebLink
Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.700 (CAT HB) <br /> Dozing method: 1.100 (50%SL) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.900 (SSD-FC) <br /> Push gradient: 1.426 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4878 <br /> Adjusted unit 362.00 LCY/hr <br /> production: <br /> Adjusted fleet 724 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.742/LCY <br /> Total job time: 78.69 Hours <br /> Total job cost: $42,267 <br /> CMCES Cost Estimating Software <br />