Laserfiche WebLink
Page 35 of 37 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Haul Coal Stockpile to Certified Landfill <br /> Site: New Horizon Mine Permit Action: SL22R Permit/Job#: C 1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 05D State: Colorado Abbreviation: None <br /> Date: 1/29/2020 County: Montrose Filename: C008-05D <br /> User: JHB <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 15-18 cy, 6x4 <br /> -Loader: CAT 988H <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 85 NA NA NA NA <br /> Ownership cost/hour: $28.38 $91.83 NA NA NA NA <br /> Operating cost/hour: $55.36 $81.19 NA NA NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. NA $0.00 NA NA NA NA <br /> cost/hour: <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $32.50 $40.65 NA NA NA NA <br /> Unit Subtotals: $116.23 $213.67 NA NA NA NA <br /> Number of Units: 3 1 0 0 0 0 <br /> Group Subtotals: Work: $562.36 Support: $0.00 Maine $0.00 <br /> Total work team cost/hour: $562.36 <br /> MATERIAL QUANTITIES <br /> Initial volume: 60,844 CCY Swell factor: 1.000 <br /> Loose volume: 60,844 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> CMCES Cost Estimating Software <br />