Laserfiche WebLink
Page 32 of 37 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Haul boxcut spoil(Mt.Nucla)to pit <br /> Site: New Horizon Mine Permit Action: SL22R Permit/Job#: C 1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 05C State: Colorado Abbreviation: None <br /> Date: 1/29/2020 County: Montrose Filename: C008-05c <br /> User: JHB <br /> Agency or organization name: Colorado Division of Reclamation,Mining and Safety <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Cat 773F <br /> -Loader: CAT 988H <br /> Support Equipment-Load Area: Cat D9T-9SU <br /> -Dump Area: Cat D9T-9SU <br /> Road Maintenance-Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker,5,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 75 50 20 50 50 <br /> Ownership cost/hour: $105.90 $91.83 $121.49 $121.49 $64.10 $27.40 <br /> Operating cost/hour: $93.41 $71.64 $52.92 $21.17 $28.09 $20.00 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 $0.00 $0.00 $0.00 $0.00 <br /> Ripper op.cost/hour: NA $0.00 $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $33.29 $40.65 $41.24 $41.24 $28.52 $0.00 <br /> Unit Subtotals: $232.60 $204.12 $215.65 $183.90 $120.70 $47.39 <br /> Number of Units: 4 1 1 1 1 1 <br /> Group Subtotals: Work: $1,134.52 Support: $399.55 Maine $168.09 <br /> Total work team cost/hour: $1,702.16 <br /> MATERIAL QUANTITIES <br /> Initial volume: 79,529 CCY Swell factor: 1.165 <br /> Loose volume: 92,651 LCY <br /> Source of estimated volume: Operator estimate of stockpile volume <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> CMCES Cost Estimating Software <br />