Laserfiche WebLink
Page 29 of 37 <br /> Cycle Time: <br /> Scraper Loading Time: 0.60 Minutes <br /> Maneuver and Spread Time: 0.70 Minutes <br /> Job Condition Correction: Site Altitude: 5700 feet <br /> Scraper Push Dozer Source <br /> Altitude Adj: 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Travel Time: <br /> Road Condition: Firm, smooth,rolling,dirt/It. surfaced,watered,maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (fpm) (min) <br /> 1 600.00 0.00 3.00 3.00 2227 0.51 <br /> Haul Time: 0.51 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (fpm) (min) <br /> 1 600.00 0.00 3.00 3.00 2890 0.43 <br /> Return Time: 0.43 minutes <br /> Total Scraper team cycle time: 2.24 minutes <br /> Adjusted for job conditions: 644.73 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 1,289.46 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 2,578.93 LCY/Hour <br /> Unadjusted unit production/hour: 776.79 LCY/Hour <br /> Optimal Number of Scrapers per push <br /> dozer: <br /> JOB TIME AND COST <br /> Fleet size: 2 Team(s) Total job time: 29.62 Hours <br /> Unit cost: $0.729 /LCY Total job cost: $55,721 <br /> CMCES Cost Estimating Software <br />