Laserfiche WebLink
Page 20 of 37 <br /> SCRAPER TEAM WORK <br /> Task description: Replace topsoil on Pond 011 (completed remove SL22) <br /> Site: New Horizon Mine Permit Action: SL22R Permit/Job#: C 1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 53BR State: Colorado Abbreviation: None <br /> Date: 2/5/2020 County: Montrose Filename: C008-53BR <br /> User: JHB <br /> Agency or organization name: Colorado Division of Reclamation,Mining and Safety <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 631G <br /> -Dozer: Cat D9T-9SU <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA NA NA NA <br /> Ownership cost/hour: $125.39 $121.49 NA NA NA NA <br /> Operating cost/hour: $132.67 $105.84 NA NA NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA NA NA NA <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $30.86 $41.24 NA NA NA NA <br /> Unit Subtotals: $288.92 $268.57 NA NA NA NA <br /> Number of Units: 2 1 0 0 0 0 <br /> Group Subtotals: Work: $846.41 Support: $0.00 Maine $0.00 <br /> Total work team cost/hour: $846.41 <br /> MATERIAL QUANTITIES <br /> Initial volume: 8,962 CCY Swell factor: 1.100 <br /> Loose volume: 9,858 LCY <br /> Source of estimated volume: 3.03 acres,22"depth <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight 2,100 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: User Provided Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 38.86 LCY Adjusted Capacity: 29.00 LCY <br /> CMCES Cost Estimating Software <br />