Laserfiche WebLink
Page 14 of 37 <br /> Cycle Time: <br /> Scraper Loading Time: 0.60 Minutes <br /> Maneuver and Spread Time: 0.70 Minutes <br /> Job Condition Correction: Site Altitude: 5700 feet <br /> Scraper Push Dozer Source <br /> Altitude Adj: 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Travel Time: <br /> Road Condition: Rutted dirt,little maintenance,no water,2"tire penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (fpm) (min) <br /> 1 2400.00 1.04 5.00 6.04 1069 2.29 <br /> Haul Time: 2.29 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (fpm) (min) <br /> 1 2400.00 -1.04 5.00 3.96 2744 1.12 <br /> Return Time: 1.12 minutes <br /> Total Scraper team cycle time: 4.71 minutes <br /> Adjusted for job conditions: 306.62 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 613.25 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 1,226.50 LCY/Hour <br /> Unadjusted unit production/hour: 369.43 LCY/Hour <br /> Optimal Number of Scrapers per push <br /> dozer: <br /> JOB TIME AND COST <br /> Fleet size: 2 Team(s) Total job time: 4.34 Hours <br /> Unit cost: $1.517 /LCY Total job cost: $8,082 <br /> SITE MAINTENANCE <br /> Task description: Remove irrigation costs for 38.2 ac.Irrigated Pasture <br /> Site: New Horizon Mine Permit Action: SL22R Permit/Job#: C 1981008 <br /> PROJECT IDENTIFICATION <br /> Task 097R State: Colorado Abbreviation: None <br /> Date: 1/31/2020 County: Montrose Filename: C008-097R <br /> User: JHB <br /> CMCES Cost Estimating Software <br />