My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-12_GENERAL DOCUMENTS - C1981008
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2020-03-12_GENERAL DOCUMENTS - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 5:00:10 AM
Creation date
3/16/2020 9:51:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
3/12/2020
Doc Name Note
& Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
SL22
Permit Index Doc Type
Findings
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
any revegetated areas, should those areas fail(Rule 3.03.1(3)(a)and 3.01.3(3)(d)). <br /> Reclamation work which remains to be done at the site includes final grading of the pit,topsoil <br /> replacement,vegetation establishment and maintenance over the liability period,removal of remaining <br /> ditches and ponds. Any person with a valid legal interest which might be adversely affected by this <br /> proposed decision may request a formal public hearing before the Mined Land Reclamation Board in <br /> accordance with Rule 3.03.2(6). Public notice of this proposed decision will be published twice in the <br /> San Miguel Basin Forum as soon as possible. Requests for public hearing must be submitted to the <br /> Division in writing within thirty days of the first publication in the San Miguel Basin Forum. If no <br /> hearing is requested within those thirty days,the Division's decision will become final. <br /> Any person with a valid legal interest which might be adversely affected by this proposed decision may <br /> request a formal public hearing before the Mined Land Reclamation Board in accordance with Rule <br /> 3.03.2(6). Public notice of this proposed decision will be published twice in the San Miguel Basin <br /> Forum for two weeks as soon as possible. Requests for public hearing must be submitted to the Division <br /> in writing within thirty days of the first publication in the San Miguel Basin Forum. If no hearing is <br /> requested within those thirty days,the Division's decision will become final. <br /> C-SL-10 <br /> Permit Number C1981-008:SL22 Page 17 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.