Laserfiche WebLink
(10) King I & II Coal Mine Area, Hydrologic Study, Resource Hydrologic <br /> Services, 01 31 2016 <br /> (11) Water Balance Study for the King II Mine, CDS Environmental <br /> Services LLC 05 08 2014 <br /> (12) GCC King I & II Water Quality Site & Analytical <br /> Recommendations Resource H dro eolo 'c Services February 5, 2016 <br /> (13) GCCE King I Upgradient Hay Gulch Alluvial Monitoring Well <br /> Specifications, Resource H dro eolo 'c Services April 28 2016 <br /> Climatological Data Summaries 5 <br /> Soil Resource Data and Analysis 6 <br /> 1 Field Data Sheet <br /> (2) Colorado State University Soil, Water and Plant Testing Laboratory <br /> Analysis <br /> 3 Soil Horizon Suitability Criteria for Reclamation <br /> Baseline Vegetation Report 7 <br /> (1) Baseline Vegetation Report, National King Coal, LLC, King II Mine, <br /> Hay Gulch Colorado, August 2005 <br /> (2) 2005 Baseline Soil & Vegetation Surveys: Boundaries and Extent <br /> Addendum, Savage and Savage, Inc. 2019 12 11 <br /> Fish and Wildlife Information 8 <br /> 1 La Plata County Wildlife: Known or Likely Species Occurrence <br /> 2 Natural Diversity Information Source Sample Maps <br /> (3) Colorado Natural Heritage Program Database Survey, Colorado <br /> State University, July 15 2017 <br /> 4 Colorado Div. of Wildlife Density Standard Approval <br /> 5 Natural Resource Survey, TR-22 Drill Sites, SWCA April 11 2014 <br /> (6) Natural Resource Survey, TR-26 Drill Sites, Ecosphere <br /> Environmental Services October, 2016 <br /> (7) Natural Resource Survey, MR-49 Drill Site, Ecosphere <br /> Environmental Services Inc. July 9, 2019 <br /> USDA Important Farmlands of La Plata County, Colorado 9 <br /> Structure Designs 10 <br /> 1 Haul Roads; Description and Certifications <br /> 2 Access Roads; Certification <br /> Hydrologic Designs 11 <br /> 1 "As-Built" Hydrology Analysis, Stoner Engineering, June 30, 2015 <br /> (2) SEDCAD Hydrology Model for TR-29 King III Portal & Access <br /> Installation <br /> (5) Safety Factor Analysis for Sediment Pond, Environmental Industrial <br /> Services, November, 2009 <br /> (6) "As-Built" Pond Certification, Fleming Engineering, September 15, <br /> 2009 <br /> Reclamation Bond Estimate 12 <br /> (1) Reclamation Cost Estimate (RCE), Prepared by Colorado Division of <br /> Reclamation, Mining & Safety <br /> 2 Air Jig Demolition RCE, MR-47• Prepared by CDRMS <br /> (3) Reclaim 0.17 acres exploratory excavation RCE, MR-50; Prepared <br /> by CDRMS <br /> Insurance: Personal Injury & Property Damage 14 <br /> GCC Energy, LLC King II Mine <br /> Table of Contents <br /> Page iii February 18, 2020 (TR-29) <br />