My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-11_REVISION - C1981035 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2020-03-11_REVISION - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 4:38:46 AM
Creation date
3/12/2020 9:42:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
3/11/2020
Doc Name
Proposed Revision Materials
From
GCC Energy, LLC
To
DRMS
Type & Sequence
TR29
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Excavation to Locate the Coal Seam Outcrop Along the East Side Slope <br /> Minor Revision MR-50 proposes to expose the coal seam on the hillside immediately <br /> adjacent to the existing surface facilities, approximately easterly from the #2 Coal <br /> Stacker Pile. The purpose of this exercise is to locate and analyze the coal seam, in <br /> order to determine the feasibility of installing additional portals to access coal <br /> reserves on State of Colorado coal lease CO-3388 and Federal coal lease COC-62920 <br /> (both held by GCC Energy). <br /> Exposing the coal seam outcrop will be achieved by using a mini-excavator traveling <br /> through the existing brush up and/or across the hillside to the anticipated elevation <br /> of the coal seam. Where necessary, topsoil from any access paths will be salvaged <br /> and replaced upon termination of the project. It is anticipated that 3 cuts will be <br /> made at locations as shown on Map King II-007 <br /> After salvaging and protecting the topsoil, a small narrow cut will be made to expose <br /> the coal seam. The seam will be measured and sampled for quality. Any coal waste <br /> exposed will either be removed and transported to the King I Refuse Pile, or replaced <br /> in the cut and covered with at least 3.5 feet of non-toxic fill material and capped with <br /> at least 6 inches of topsoil. All areas disturbed during this project will be reclaimed <br /> and re-seeded as detailed in Section 2.05.4. <br /> Excavation Construct King III Portals at the Coal Seam Outcrop Along the East <br /> Side Slope <br /> TR-29 Proposes to construct King III portals and access roads at the coal seam <br /> outcrop, along the east side slope above the stacker and south edge of the topsoil pile <br /> (See map King II-007 (TR-29)). <br /> After salvaging and protecting the topsoil, excavation will commence to develop the <br /> access roads and portal benches. Any coal waste exposed will be removed and <br /> transported to the King I Refuse Pile. All areas disturbed during this project will be <br /> reclaimed and re-seeded as detailed in Section 2.05.4. <br /> An access road, along with buried utility lines, will be continued from the northwest <br /> corner of the Substation and around the north side of the #2 Stacker coal pile to <br /> connect with the aforementioned portal access roads (See maps King II-007 (TR-29), <br /> King II-007A (TR-29) and King II-007M (TR-29)). This road lies within previously <br /> disturbed areas. Reclamation for these areas is discussed elsewhere in this <br /> document. <br /> GCC Energy, LLC King II Mine <br /> Section 2.05.4 <br /> Page 21 February 18, 2020 (TR-29) <br />
The URL can be used to link to this page
Your browser does not support the video tag.