My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-11_REVISION - C1981035 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2020-03-11_REVISION - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 4:38:46 AM
Creation date
3/12/2020 9:42:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
3/11/2020
Doc Name
Proposed Revision Materials
From
GCC Energy, LLC
To
DRMS
Type & Sequence
TR29
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GGG thru GGG2 Air Jig Reject Conveyor: 24" conveyor which draws <br /> rock from the bottom of the air jig facility and delivers it to an air jig <br /> reject stockpile. <br /> HHH thru HHH6 Air Jig Raw Coal Conveyor: 36" conveyor which <br /> draws stoker sized coal from the bottom of the crusher/screen facility <br /> and delivers it to the air jig feed bin. <br /> III Air Jig Reject Bin: Constructed using 2'wide stackable concrete <br /> blocks stacked approximately 8' high, with outside dimensions of <br /> approximately 24' wide x 26' deep, or about 72 linear feet of block wall. <br /> These blocks can be sold and transported off site at final reclamation. <br /> Contains rock from the air jig reject conveyor. This material is then <br /> loaded into trucks and delivered to the approved refuse pile at the King I <br /> mine. <br /> H1) Total King III Portal Reclaim Volume: Map King II-010D shows a <br /> volumetric calculation of fill quantities required to backfill all King III <br /> portals and the access road to the belt/return portal area. <br /> JJJ King III Intake Portal Structure: This concrete and steel structure <br /> will be broken and used for portal backfill. <br /> KKK King III Conveyor Portal Structure: This concrete and steel <br /> structure will be broken and used for portal backfill. <br /> LLL) Return Portal Structure: This concrete and steel structure will be <br /> broken and used for portal backfill. <br /> MMM thru MMM 6 King III Raw Coal Conveyor: 500 feet of overland <br /> 42" covered conveyor to convey coal from the King III conveyor portal the <br /> #1 Stacker pile. The outside portion will be covered, with (6) bent <br /> supports. The trusses will be 4' deep for 425' then 6.5' deep truss for the <br /> cantilever section at the end for 75'. <br /> GCC Energy, LLC King II Mine <br /> Section 2.05.4 <br /> Page 6A February 18, 2020 (TR-29) <br />
The URL can be used to link to this page
Your browser does not support the video tag.