My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-11_REVISION - C1981035 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2020-03-11_REVISION - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 4:38:46 AM
Creation date
3/12/2020 9:42:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
3/11/2020
Doc Name
Proposed Revision Materials
From
GCC Energy, LLC
To
DRMS
Type & Sequence
TR29
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Excavation Construct King III Portals at the Coal Seam Outcrop Along the East <br /> Side Slope <br /> Anticipated excavation to construct the King III portals and access roads at the coal <br /> seam outcrop, along the east side slope above the stacker and south edge of the <br /> topsoil pile, would be located within the Archuleta-Sanchez soil map unit. This soil is <br /> a shallow stony loam with limited stratum development. Excavation of the shallow A <br /> horizon of this soil with replacement after project completion should not result in <br /> significant adverse impacts to the soil. This soil was sampled and analyzed, with <br /> results in Appendix 6(2) of the permit document; sample designation AS 1. Please <br /> see Savage and Savage, Inc. memo, Baseline Soil 8a Vegetation Survey Boundaries <br /> and Extent, December 11, 2019 at Appendix 7(2) for further discussion and a <br /> boundary and extent image of the survey area. <br /> An access road, along with buried utility lines, will be continued from the northwest <br /> corner of the Substation and around the north side of the #2 Stacker coal pile to <br /> connect with the aforementioned portal access roads (See maps King II-007 (TR-29), <br /> King II-007A (TR-29) and King II-007M (TR-29)). This road lies within previously <br /> disturbed areas. Soils and reclamation are discussed elsewhere in this document. <br /> GCC Energy, LLC King II Mine <br /> Section 2.04.9 <br /> Page SA February 18, 2020 (TR-29) <br />
The URL can be used to link to this page
Your browser does not support the video tag.