Laserfiche WebLink
any remaining mucked material will be spread on the sites. The new openings will be durably <br /> constructed in order to be permanent features that can be secured. <br /> 6. The reclamation task details and associated costs are shown on the attached Reclamation Costs <br /> page. Please note that due to the step-wise method of excavating and constructing secure, <br /> permanent openings, and their permanency on the sites,the adit or shaft dimensions given in <br /> another attachment are not relevant to closure costs. CRG has generously estimated 8 hours of <br /> dozer time for each site,whether it is for backfilling an uncompleted opening or final grading <br /> around a completed opening. We recognize however,that all sites with completed mine <br /> openings which require no further closure earthwork should still remain bonded until all other <br /> final reclamation earthwork at that site is completed,and a bond reduction request is approved. <br /> We hope that this information is sufficient to address the adequacy concerns. If there is more <br /> information that is needed please contact us. <br /> r <br /> Sincerely, ' <br /> cam- s <br /> Jake Wilkinson <br /> Manager, CRG Mining LLC <br /> Attachments: Site Locations, WQ Analytes, Reclamation Costs, Gold Brick Mining District Geology Map <br /> Cc: Stephen Baghdadi, CRG Mining LLC <br />