Laserfiche WebLink
5) This permit may be revoked or suspended for non-compliance with the Act or applicable rules or <br /> regulations promulgated by the Board,the permit,or by violation of a Board Order. <br /> 6) a) Pursuant to 34-32-118(5) of the Act, the Board has a right of entry to reclaim the lands affected <br /> by the operation or to respond to an emergency where the Division determines that any of the <br /> conditions of C.R.S.34-32-124.5 exist <br /> b) The Board will enter the lands to perform reclamation only if the Board has determined that: <br /> L Reclamation required by the permit, statute, or regulations to be performed upon such lands <br /> has not been performed,or <br /> ii. Financial warranty forfeiture proceedings described in the Act or similar provisions of <br /> subsequent laws, if any, have been initiated. <br /> c) The Division, acting for the Board, will enter lands to respond to an emergency only where the <br /> Division determines that any of the conditions of Construction Material Rule 8.4.2 exist. <br /> 7) The additional conditions set forth in the attached rider, if any,are incorporated herein by reference. <br /> L--/ a) Rider is attached. <br /> / XX / b) No rider is attached. <br /> MINED LAND RECLAMATION BOARD <br /> COLOR ADO DEPARTMENT OF NATURAL RESOURCES <br /> Virginia Brannon <br /> Division Director <br /> M-AP-32 <br /> Page 3 of 3 <br />