(10) King I & II Coal Mine Area, Hydrologic Study, Resource Hydrologic
<br /> Services, 01 31 2016
<br /> (11) Water Balance Study for the King II Mine, CDS Environmental
<br /> Services LLC 05 08 2014
<br /> (12) GCC King I & II Water Quality Site & Analytical
<br /> Recommendations, Resource H dro eolo is Services, February 5, 2016
<br /> (13) GCCE King I Upgradient Hay Gulch Alluvial Monitoring Well
<br /> Specifications, Resource H dro eolo is Services, April 28, 2016
<br /> Climatological Data Summaries 5
<br /> Soil Resource Data and Analysis 6
<br /> 1 Field Data Sheet
<br /> (2) Colorado State University Soil, Water and Plant Testing Laboratory
<br /> Analysis
<br /> 3 Soil Horizon Suitability Criteria for Reclamation
<br /> Baseline Vegetation Report 7
<br /> (1) Baseline Vegetation Report, National King Coal, LLC, King II Mine,
<br /> Hay Gulch, Colorado, August 2005
<br /> (2) 2005 Baseline Soil & Vegetation Surveys: Boundaries and Extent
<br /> Addendum, Savage and Savage, Inc. 2019 12 11
<br /> Fish and Wildlife Information 8
<br /> 1 La Plata County Wildlife: Known or Likely Species Occurrence
<br /> 2 Natural Diversity Information Source Sample Maps
<br /> (3) Colorado Natural Heritage Program Database Survey, Colorado
<br /> State University, July 15, 2017
<br /> 4 Colorado Div. of Wildlife Density Standard Approval
<br /> 5 Natural Resource Survey, TR-22 Drill Sites, SWCA April 11, 2014
<br /> (6) Natural Resource Survey, TR-26 Drill Sites, Ecosphere
<br /> Environmental Services, October, 2016
<br /> (7) Natural Resource Survey, MR-49 Drill Site, Ecosphere
<br /> Environmental Services, Inc. July 9, 2019
<br /> USDA Important Farmlands of La Plata County, Colorado 9
<br /> Structure Designs 10
<br /> 1 Haul Roads; Description and Certifications
<br /> 2 Access Roads; Certification
<br /> Hydrologic Designs 11
<br /> 1 "As-Built" Hydrology Analysis, Stoner Engineering, June 30, 2015
<br /> (2) SEDCAD Hydrology Model for TR-29 King III Portal & Access
<br /> Installation
<br /> (5) Safety Factor Analysis for Sediment Pond, Environmental Industrial
<br /> Services, November, 2009
<br /> (6) "As-Built" Pond Certification, Fleming Engineering, September 15,
<br /> 2009
<br /> Reclamation Bond Estimate 12
<br /> (1) Reclamation Cost Estimate (RCE), Prepared by Colorado Division of
<br /> Reclamation, Mining & Safety
<br /> 2 Air Jig Demolition RCE, MR-47; Prepared by CDRMS
<br /> (3) Reclaim 0.17 acres exploratory excavation RCE, MR-50; Prepared
<br /> by CDRMS
<br /> Insurance: Personal Injury & Property Damage 14
<br /> GCC Energy, LLC King II Mine
<br /> Table of Contents
<br /> Page iii February 28, 2020 (TR-29)
<br />
|