Laserfiche WebLink
2. General Reclamation Items <br />The office, shop, and other minor structures in the office/shop area will remain for commercial use <br />after the mine is closed. The truck scale foundation and concrete basin will need demolition. The <br />access road will remain for access to the upper terrace. These costs are considered fixed for each <br />task. <br />Table L-1: Phase 1 Reclamation Table <br />Remove all diesel tanks, truck scale and foundation, various surface supplies, and 2 $7,500 <br />final gravel stockpiles <br />Backfill the mining face from 1.5H:1V to 3HAV slope. 0.5 $83,333 <br />• 55,555 CY @ $1.50/CY <br />Topsoil of disturbed areas 0.2 $18,150 <br />• 10.0 acres @ 9 inches = 12,100 cubic yards at $1.50 per cubic yard <br />Rip the pit floor and compacted areas: 10.0 acres @ $200 per acre 0.5 $2,000 <br />I <br />Disc topsoil areas prior to seeding: $100 per acre x 10.0 acres 0.1 $1,000 <br />Seed and mulch all disturbed areas. Drill seeding and crimp mulching will be 0.1 $8,500 <br />employed at $850/acre x 10.0 acres. Assume 50% failure rate. <br />C Totals T3.9 ($120,483 <br />DRMS Costs (28% x direct costs) $33,735 <br />Stage 1 Bond Amount I $154,218 <br />I! <br />Rincon Materials L-2 Greg lxwicki and Assceistes. PH C <br />February 2020 <br />