Laserfiche WebLink
-4- <br />12. Primary future (Post -mining) land use (check one): <br />!D Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />n Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial/Commercial(1C) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary present land use check one): <br />0 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />II Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) fl Recreation(RC) IndustriaUCommercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dozer, loader, conveyor, and haul truck <br />15. On Site Processing: • Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Dozer, loader, conveyor, and haul truck <br />List any designated chemicals or acid -producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />