My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-05_PERMIT FILE - M2020018
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020018
>
2020-03-05_PERMIT FILE - M2020018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2020 9:23:02 AM
Creation date
3/5/2020 12:12:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020018
IBM Index Class Name
Permit File
Doc Date
3/5/2020
Doc Name
Application
From
Rincon Partners, LLC
To
DRMS
Email Name
THM
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5_2 Irrigated Pasture Post Mining Land Use <br />Table E-4: Irrigated Pasture Seed Mix <br />Species may change depending on availability. Broadcast rate is twice the drill seed rate. <br />Fertilizer <br />Straw Mulch <br />Tackifier� <br />Fiber Mulch <br />Certified weed free hay or straw <br />Lmulch <br />Table E-5: Revegetation Components <br />Di -ammonium phosphate (18-46-0) 250 lbs/acre <br />— ------ -- —--- <br />Weed free 80 bales/acre <br />Plant based As recommended by supplier <br />Wood cellulose 20_0 lbs/acre <br />2000 lbs/acre <br />6. Post -Reclamation Site Drainage <br />The main drainage channels will be reconstructed and have been designed to pass a 100 -year, 24- <br />hour storm event (Appendix 2: Channel and Culvert Designs). All drainage outside of the <br />reconstructed channels will sheet flow down the reclaimed side slopes (3H:1 V) and across the <br />reclaimed pit floor, eventually infiltrating into the underlaying alluvium. Small ponds are <br />anticipated to form during reclamation from the collection of irrigation tailwater and some runoff. <br />All reconstructed channels are also discussed in Exhibit G and shown on Map F. All reclamation <br />ponds will be graded to 3H:1 V slopes or shallower. <br />7. Revegetation Success Criteria <br />Rangeland revegetation will be deemed adequate for the rangeland portion when erosion is <br />controlled, and the vegetation cover is similar to the existing cover and is considered satisfactory <br />according to Division standards. No shrub standard is proposed for the reclamation success criteria. <br />Rincon Materials E-5 Greg 1.wicki and As iatm PL1.(' <br />February 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.