16)Please provide an estimate of the actual costs to reclaim the site based on what it would <br /> cost the State of Colorado using an independent contractor to complete reclamation. The <br /> Office adds up to an additional maximum eighteen and one half(18.5%)percent of that <br /> total,which includes a private contract,typical overhead costs and profit. <br /> Direct Cost: <br /> i. Backfilling: -��.1(� (cubic yards)X$ (cost per yard)=Total$ 1384 <br /> ii. Grading: 5 5• 5 (cubic yards)X$ � � (cost per yard)=Total$ 55 5l� <br /> iii. Topsoil: (cubic yards)X$ (cost per yard)=Total $ / . <br /> iv. Seeding: 1 (acres)X$ -01) (cost per acre)=Total$ <br /> v. Mobilization: (Pieces of equipment)X$ b•00 (cost per equipment)_ <br /> Total$ e, <br /> Direct Cost Subtotal: $ <br /> Division's total overhead cost: X 18.5% <br /> Division's Total cost: $ 5' 3 3 . <br /> Note: Based on the Division's experience the required financial warranty is normally set at <br /> approximately$2,500 per acre. Therefore,a typical 5 acre permit will have a total required financial <br /> warranty in the amount of$12,500. <br />