My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-02_REVISION - M1977211
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2020-03-02_REVISION - M1977211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:42:59 PM
Creation date
3/2/2020 2:51:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Revision
Doc Date
3/2/2020
Doc Name Note
Response #4
Doc Name
Adequacy Review Response
From
Continental Materials Corporation
To
DRMS
Type & Sequence
AM4
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C CONTINENTAL MATERIALS CORPORATION <br /> 6.4.4 EXHIBIT D—Mining Plan <br /> 9a. Provide a compaction specification...The response is not adequate, additional clarification is <br /> required.The provided specifications reference ASTM 4343-18. Please confirm this should be ASTM <br /> 4943-18. <br /> Response: The compaction specification should be ASTM 4943-18. The text in Exhibit D has been <br /> revised to address this comment. <br /> 6.4.5 EXHIBIT E—Reclamation Plan <br /> 12a.An estimated volume of available topsoil ...The response indicates about half the necessary topsoil <br /> is available onsite, leaving approximately 56,000 CY of topsoil that must be imported. The DRMS <br /> requires a cost estimate of topsoil importation including possible source(s)and unit price. <br /> Response: CMC's reclamation cost estimate includes costs to mix organic material into the site soil to <br /> manufacture the growth media;therefore,there should not be an additional cost to import topsoil. <br /> 12c. If growth media is to be "manufactured"...The response is adequate. Note the DRMS will include <br /> topsoil importation in the reclamation cost estimate. <br /> Response: CMC's reclamation cost estimate includes costs to mix organic material into the site soil to <br /> manufacture the growth media;therefore,there should not be an additional cost to import topsoil. <br /> 33b.Table G-3: The response is not adequate, additional information is required. Please address the <br /> following: <br /> i.The Lower South Channel, WS-9 should be 20 ft wide to be consistent with the SEDCAD model output <br /> in the response. <br /> Response: Table G-3 has been updated with the 20-ft bottom width. <br /> ii. Based on the channel profiles on Exhibit G-3,there are four engineered channel segment not <br /> addressed: 1)WS-4 at 2%slope, 2) Outlet Channel WS-11 at 7%slope, 3) Upper most WS-3 cross <br /> channel (WS-1 flows?)at 6%slope, 4) lower WS-3 cross channel at 2%slope. Please include these in <br /> Table G-3. <br /> Response: Table G-3 has been updated with designs for these channel segments. <br /> 33c. Channel Transition Design:The response is not adequate.The comment was misunderstood.The <br /> comment is meant to address the cross channel intersection with south-flowing terrace channels(see <br /> below), not the intersection with WS-4. <br /> Pikeview Quarry Amendment 4, Response to Adequacy <br /> March 2, 2020 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.