Laserfiche WebLink
CHIC CONTINENTAL MATERIALS CORPORATION <br /> 7.0 Monitoring the fill progress <br /> 7.1 The existing Leica monitoring system shall remain in use with additional prisms <br /> added to the fill slope as the grade is completed. Records shall be maintained on site <br /> and available for DRMS inspection. <br /> 7.2 Daily inspection of the quarry shall be performed by authorized onsite personnel prior <br /> to each days shift starting work. No work shall commence in or around the slope <br /> area without the approval of the onsite inspection. Daily logs shall be maintained on <br /> site and available for DRMS inspection. <br /> 7.3 Construction surveying shall be completed onsite with grade controls to ensure the <br /> reclamation plan is being constructed to grade and level as approved. Surveying <br /> records shall be kept on site and available for DRMS inspection <br /> 7.4 Drone flights shall be performed at the end of each month to ensure topography is <br /> consistent with the overall reclamation plan. Drone information will be used to <br /> determine progress payments and reconciled with ground information each month. <br /> Records will be maintained onsite and available for DRMS inspection. <br /> 7.5 Monitoring System shall remain in place for the entire fill project and an <br /> undetermined amount of time after the fill is completed to provide data for the <br /> finished slope stability. <br /> 7.6 CMC shall submit monitoring summary reports on a monthly basis. <br /> Pikeview Quarry Amendment 4 <br /> D-13 <br />