My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-02_REVISION - M1977211
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2020-03-02_REVISION - M1977211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:42:59 PM
Creation date
3/2/2020 2:51:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Revision
Doc Date
3/2/2020
Doc Name Note
Response #4
Doc Name
Adequacy Review Response
From
Continental Materials Corporation
To
DRMS
Type & Sequence
AM4
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHIC CONTINENTAL MATERIALS CORPORATION <br /> 7.0 Monitoring the fill progress <br /> 7.1 The existing Leica monitoring system shall remain in use with additional prisms <br /> added to the fill slope as the grade is completed. Records shall be maintained on site <br /> and available for DRMS inspection. <br /> 7.2 Daily inspection of the quarry shall be performed by authorized onsite personnel prior <br /> to each days shift starting work. No work shall commence in or around the slope <br /> area without the approval of the onsite inspection. Daily logs shall be maintained on <br /> site and available for DRMS inspection. <br /> 7.3 Construction surveying shall be completed onsite with grade controls to ensure the <br /> reclamation plan is being constructed to grade and level as approved. Surveying <br /> records shall be kept on site and available for DRMS inspection <br /> 7.4 Drone flights shall be performed at the end of each month to ensure topography is <br /> consistent with the overall reclamation plan. Drone information will be used to <br /> determine progress payments and reconciled with ground information each month. <br /> Records will be maintained onsite and available for DRMS inspection. <br /> 7.5 Monitoring System shall remain in place for the entire fill project and an <br /> undetermined amount of time after the fill is completed to provide data for the <br /> finished slope stability. <br /> 7.6 CMC shall submit monitoring summary reports on a monthly basis. <br /> Pikeview Quarry Amendment 4 <br /> D-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.