Laserfiche WebLink
DUE DILIGENCE CERTIFICATIOti <br /> T e Board wishes to ensure tha_ Prospect..e Successors are full~ informed of their duties and <br /> obli,ations should they beccrre Successor to the Permit. Accordin?l,, the Prospectir e Successor <br /> must carefully review the ite ns below and roust initial i:_dicatirg its a`reemc-nt and <br /> understandinz. <br /> If the Application is approved.the Prospecti--e Successor�&ill assume all liabilitt <br /> for the recla:ration of the affected land, and f r compliance with the H rd Pock <br /> Act and RL:les or the Constr-,ctior. Materials Act and Rules. as applicable (av aiiabie <br /> online a"ht-Lc:, Su'ccesscr wl: be <br /> liable for any pre-existin- conditions or viCla`,ors. whether kr•ov r or Urn"ioti,?i at <br /> the tiro~ of tie SO. It is the Prospectt,_ Successor s so e rest onsibilitl to <br /> Inyestl`tztC t.:? opera;on pr:,Dr is fil.i.g an kpp:ication. <br /> tit If t e Appl-caq :+-n is appr•)4ed. the SL:cces-o" will, re soIei: responsrCl�- for <br /> I 31i>ta:ri: t1he min.in_ and rec!a:7.a 1-t'. oper3.icnS tit COMPl:arce 'vvi`.h the <br /> Recta .u..�r_ Pera:.i.. The eria,:t includes the original a,p,.rnee AYplicat:c-n. along <br /> wii:- ar,- and all subsequent rep isions. a:mendn.ents. and coryersiors t'erzto It is <br /> not for a Perr^.it to include dozens of documents that span r.:;r. years. <br /> It is the SL_ccessor's sole responsi il:ts. to obtain a full and com;�'•ete cop; of the <br /> Permit and tt understand the est_:-, o t _re-under. Permit <br /> docurnerts ma-, be purchased from t''ie Div:sion o;Reclamation. L lining and Safety <br /> (the "Division-) uper regLest or 4ie�,,ed on the Di�,iisirr.'s web-cite a. <br /> :L�.,:d:�-is`:-e�.ln{.S•__._e.C;�.1 ci Grr,::ct <br /> If the c;p pi:.aticr, is approved, t'-e S'..ccesscr r .i=t sui-ii Anr•L:al Fees ar-' %rnual <br /> R l L,1•: Cr. i:ti 1`.:!J- date of t.' tr\Cl i_i; c_i'. �'.":'.ii F::' <br /> Hard rock and' desit>nated minin, operati,,ns, consult C.R.S. § 34-32-127(2) for the <br /> amount of the Annual Fee. For construction materials operations. ccrsult the <br /> C.R.S. 3z-32.5-125 for the amount of the Annual Fee. Required annua'. reporting <br /> information is described in Hard R.-ck and Construction Ma.erials Rule 1.15 and in <br /> the :Annual Report For:, provided by the Division. Failure to submit Annual Fees <br /> or Annual Retorts may result in enforcement action. <br /> - 7 - <br />