My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-21_REVISION - M2010055 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010055
>
2020-02-21_REVISION - M2010055 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 8:23:30 AM
Creation date
3/2/2020 9:00:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010055
IBM Index Class Name
REVISION
Doc Date
2/21/2020
Doc Name
Notice of Surety Increase
From
DRMS
To
Konig Ag Co.
Type & Sequence
SI1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Final Reclamation <br /> Site: Konig Borrow Pit Permit Action: Reclamation Permit/Job#: M2010055 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 1/27/2020 County: Weld Filename: M055-000 <br /> User: ECS <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Replace Topsoil on 18ac SCRAPERI 1 33.65 $10,227 <br /> 002 Reveg 18 ac REVEGE 1 16.00 $25,440 <br /> 003 Backfill Stormwater retention pond (1800cy) NA 1 2.00 $4,000 <br /> 004 slope highwall to 3:1 (500'long and 10'high) DOZER 1 11.18 $1,965 <br /> 006 mob/demob MOBILIZE 1 8.00 $4,170 <br /> L- SUBTOTALS: 70.83 $45,802 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $925 <br /> Performance bond: 1.05 Total= $481 <br /> Job superintendent: 0.00 Total= $0 <br /> Profit: 10.00 Total= $4,580 <br /> TOTAL O&P= $5,986 <br /> CONTRACT AMOUNT(direct+O&P)= $51,788 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0 <br /> Reclamation management and/or administration: 5.00 $2,589 <br /> CONTINGENCY: 3.00 Total= $1,374 <br /> TOTAL INDIRECT COST= $10,450 <br /> TOTAL BOND AMOUNT(direct+indirect)= $56,252 <br />
The URL can be used to link to this page
Your browser does not support the video tag.