My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-26_REVISION - M2002004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002004
>
2020-02-26_REVISION - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:38:41 PM
Creation date
2/26/2020 1:33:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
REVISION
Doc Date
2/26/2020
Doc Name
Adequacy Review Response
From
Resource Hydrogeologic Services
To
DRMS
Type & Sequence
TR7
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Creation Date: Revision Date: <br /> /��� 02/18/2020 2/19/2020 <br /> v Control Number: <br /> PUE.EN.P.003.01 Pa e: 1 of 6 <br /> Title: GCC Rio Grande Pueblo Plant Groundwater Monitoring Well Compliance Sampling <br /> 1.0 SCOPE <br /> This procedure covers the process for obtaining and submitting groundwater monitoring well samples <br /> to an analytical lab as required by the DRMS approved Sampling and Analysis Plan (SAP). <br /> 2.0 REFERENCES AND RELATED DOCUMENTS <br /> PUE.SA.P.015 Workplace Examinations <br /> PUE.SA.F.005 Workplace Examination <br /> PUE.EN.D.026 SAP for Groundwater Monitoring <br /> 3.0 RESPONSIBILITY <br /> N/A <br /> 4.0 TRAINING REQUIREMENTS <br /> Read and understand these procedures. Contact the Environmental Engineer if you have questions <br /> regarding these instructions. <br /> 5.0 REPORTING AND COMMUNICATION <br /> All groundwater sampling records (field form)are provided to the GCC Environmental Engineer who <br /> will store the electronic versions on the Pueblo Environmental Shared Drive. <br /> All analytical will be stored on the Pueblo Environmental Shared Drive upon receipt from the lab. <br /> 6.0 DEFINITIONS <br /> N/A <br /> 7.0 MATERIALS AND EQUIPMENT <br /> • PPE <br /> • Wellhead lock key(s)or combination number <br /> • Clipboard and groundwater sampling record (field form), multiple indelible ink pens & <br /> markers <br /> • Phone/camera/calculator <br /> • Calibrated water quality meter(YSI Pro 1030 or similar)and accessories,calibration fluids <br /> • Graduated cylinder <br /> • Water level indicator <br /> • 1.25"X 36"disposable poly bailer(s),new in factory plastic bag <br /> • Bailer nylon cord/twine, new/unused on roll stored in clean plastic bag <br /> • Peristaltic pump(Geotech Geopump or similar)&power cable accessories <br /> • 0.45 µm filters,approximately 5-foot length of new 3/8"ID silicone,Tygon or other peristaltic <br /> pump-appropriate environmental-grade tubing <br /> • 1-gallon new,disposable poly cubitainer(s) <br /> • Sample cooler with "GW-Compliance"bottle sets(bring spares!)and bagged ice <br /> • Ziploc bags for ice and COC <br /> • Clear packing tape <br />
The URL can be used to link to this page
Your browser does not support the video tag.