Laserfiche WebLink
11 February 2020 C-1994-082/Yoast Mine RAR <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> Y -Air Resource Protection R - Roads <br /> N -Availability of Records Y - Reclamation Success <br /> N -Backfill& Grading R - Revegetation <br /> N -Excess Spoil and Dev. Waste Y - Subsidence <br /> N -Explosives Y - Slides and Other Damage <br /> Y -Fish&Wildlife N - Support Facilities On-site <br /> R -Hydrologic Balance N - Signs and Markers <br /> Y - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N -Processing Waste N - Topsoil <br /> COMMENTS <br /> This was an aerial inspection of the Yoast Mine, C1994082, operated by Seneca Property LLC. <br /> The inspection was conducted aerially by Brock Bowles. The images were analyzed and the report <br /> prepared by me, Robin Reilley of the DRMS. Skies appeared cloudy. The site was snow covered <br /> and ponds were snow and ice covered. The established vegetation has gone dormant for the winter <br /> and is also for the most part snow covered, some appears gold colored against the snow with the <br /> oak brush appearing orange in some areas. <br /> PERMITTING ACTIONS: <br /> o Partial Phase II and III bond release request is under analysis at DRMS. <br /> o Permit Renewal No 5 is in process at DRMS <br /> INSPECTION: <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Reclamation is for the most part complete and executed as permitted. With the exception of some structure pads <br /> all structures have been demolished. <br /> ROADS Rule 4.03 Construction 4.03.1(3), 4.03.2(3);Drainage 4.03.1(4), 4.03.2(4); Surfacing and <br /> Maintenance 4.03.1(5) and(6) 4.03.2(5) and(6). <br /> o Roads in and around the facilities were snow covered and appeared in good repair and functioning <br /> adequately. <br /> o No standing water or ice were noted in the imagery. <br /> o No activity is going on at the site. <br /> HYDROLOGIC BALANCE-Rule 4.05 <br /> General Requirements 4.05.1; Effluent Standards 4.05.2; Divergence and Conveyance of Overland <br /> Flow 4.05.3;Diversions 4.05.4; Sediment Control Measures 4.05.5, 4.05.6; Discharge Structures <br /> 4.05.7;Impoundments 4.05.9; Ground Water Monitoring 4.05.13; Underground Mine Entry 4.05.10; <br /> Surface and Ground Water Monitoring 4.05.13;Stream Buffer Zones 4.05.18: <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 2 of 5 <br />